New Construction
What building from the ground up actually involves — structure, permits, cost, and the decisions that determine the outcome before design begins.
Yes — but the elevation requirement changes the house. What your flood zone demands, how the elevation gap reshapes the design, and what to check before you make an offer.
Usually 18 to 30 months from engaging an architect to moving in — and construction is only half of it. A phase-by-phase breakdown of where the time actually goes, and what makes projects run long.
An honest comparison of both models — when design-build is genuinely the right call, what architect-led buys you, and the third arrangement nobody markets because there's nothing to sell.
The frame, the systems, and the finishes lead most budgets — until the site, the climate, or the code takes over. What actually drives the biggest costs, and what a quote usually leaves out.
What an architect costs for a house — fee models and honest ranges (5–15% of build cost, ~$2–15/sq ft), what drives the number, and when the fee pays for itself.
Building permit timelines range from 2 weeks to 9 months depending on where you're building, what you're building, and how you submit. Here's what actually determines your timeline — and how to shorten it.
How much land do you need, and what fits on your lot? Setbacks, FAR, coverage and height explained — plus a calculator for the biggest house you can build.
Your first architect meeting isn't about design — it's about feasibility, mutual fit, and a clear path forward. Here's what to bring, what to watch for, and how to read the room.
An architect's role on a residential project runs across six phases — from brief to construction administration. Here's what that responsibility looks like at each stage, and why gaps between phases are where projects most often go wrong.
Budget control in residential architecture isn't a checkpoint at the end of design — it's a discipline embedded in every phase. Here's how it works, and where most projects lose control of the numbers.
European and US residential architecture differ in process, not style — how the team is structured, how long design takes, and how materials and energy performance are treated. Here's what that means for your project.
The tools that once made remote practice the domain of large firms are now available to boutique studios. Here's how remote residential architecture actually works — and why geography shouldn't be the deciding factor.
Flat, pitched, or mono-pitched — the right roof depends on your climate, your budget, and the building itself. Here's how to make the call before you commit to a system.
Every drawing and schedule in a construction set — plans, sections, details, A/S/M/E/P disciplines, and the difference between a permit set and a complete one that protects your budget.
Square footage is only one input. The decisions that quietly inflate a construction budget are embedded in the site, the structure, the ceiling height, and the glazing — before a contractor ever quotes. Here's what to understand before design is fixed.
The four phases of designing a house, in plain English — what you receive and decide at each, and why every change gets more expensive the later it lands.