Journal

A practitioner's perspective on architecture and the built world — the design decisions, market realities, and project knowledge that don't usually get written down. Published weekly.


Contents:

Architecture, culture, and the ideas worth arguing about.

What building on St. John, St. Thomas, and St. Croix actually involves — from land to permit to construction.

Renovation in Romania — what the building, the process, and the design actually involve.

How we work with clients across time zones, jurisdictions, and project types.

What building from the ground up actually involves — structure, permits, cost, decisions.

What existing buildings require before, during, and after — structure, regulation, and cost.


Latest articles:

US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

Why Building on St. John Takes Longer Than You Think — And How to Plan for It

Building a custom home on St. John, USVI typically takes 24–36 months from permit application to certificate of occupancy — roughly double the 12.5-month average for a custom home on the US mainland, according to the US Census Bureau's 2022 Survey of Construction.

The reasons are structural, not incidental: steep terrain drives up engineering complexity, a multi-agency permitting process has no fast lane, every material travels by barge, and there is no municipal water supply. None of these are surprises if you know to look for them. Most first-time builders on St. John don't, and they pay for it in schedule and budget.

Read More
US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

What Is the USVI Coastal Zone Permit and Do You Need One?

A coastal zone permit is a mandatory approval issued by the USVI Department of Planning and Natural Resources (DPNR) for any development activity within the territory's designated coastal zone. If you are planning a new residential build in the USVI and your site falls within that zone — which, given the territory's geography, is more likely than not — you cannot break ground without one.

For a private home, the process runs through a Minor Permit procedure. Under the Virgin Islands Coastal Zone Management Act, DPNR is legally required to decide on a complete minor permit application within 90 days; end-to-end, including application preparation, the process typically runs 4–6 months.

Read More
US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

How We Design USVI Villas That Work as Vacation Rentals

A USVI villa that performs as a vacation rental isn't luck — it's the result of one decision made before anything is drawn: how much will you actually use this property, and what does that mean for everything else? Get that answer right, and the design brief writes itself. Skip it, and you'll end up with a beautiful house that either sits empty when you're not there or feels like a hotel when you are.

Read More
US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

Buying Land on St. John: What to Check Before You Make an Offer

Buying land on St. John, USVI requires more due diligence than a comparable mainland purchase — and the checks that matter most are not the ones most buyers think to make. Before you make an offer, you need to verify slope, site access, solar orientation, zoning, and whether your plot falls under Coastal Zone Management (CZM) permitting. Miss any of these and you risk buying a plot that is either unbuildable, prohibitively expensive to build on, or legally constrained in ways that will reshape your project before it starts.

Read More
US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

USVI Construction Costs Per Square Foot: What to Expect Before You Build

Building a home in the US Virgin Islands currently costs between $400 and $700+ per square foot, depending on site conditions, structural approach, finish level, and how well the project is managed before a single foundation is poured. That range is drawn from active projects as of Q1 2026 — not from published indices, which don't exist for this market, and not from contractor ballparks, which routinely understate the real number. If you're planning a build in the USVI and working from a figure below $400/sqft, you are not working from a realistic budget.

Read More
US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

The USVI New Build Field Guide: everything you need to know before you build in the US Virgin Islands

Building a custom home in the US Virgin Islands means navigating a construction environment that is categorically different from anything on the mainland: imported materials, hurricane-grade engineering requirements, a two-track permitting system that can add years to your timeline, and a terrain that makes site selection one of the most consequential decisions you'll make before a single drawing is produced.

Done right, a USVI build produces one of the most resilient, high-value residential assets in the Caribbean. Done without local knowledge, it produces cost overruns, permit delays, and buildings that underperform from day one. This guide covers the full process — land, permits, design, utilities, costs, and construction management — so you arrive at your first conversation with an architect knowing what you're actually getting into.

Read More
Process Andrei Vasilief Process Andrei Vasilief

What to Expect From Your First Meeting With an Architect

Most people walk into their first meeting with an architect expecting to talk about design. Sketches, references, maybe a preliminary idea of what the house could look like. That's not what this meeting is. Understanding what it actually is — and what both parties are doing in the room — will make you a better client from day one.

Read More
Process Andrei Vasilief Process Andrei Vasilief

The Two Mistakes First-Time Residential Developers Make (And Why They Have the Same Fix)

Most first-time residential developers don't fail because their idea was bad. The site was real, the numbers looked plausible, the design was solid. They fail — or stall, or quietly walk away — because of two specific misunderstandings that show up at the beginning of almost every first development. The good news is they have the same fix.

Read More
Editorial Andrei Vasilief Editorial Andrei Vasilief

The Anthropic Report, the LinkedIn Feed, and What AI Actually Does in Architecture Right Now

There is an image that has been circulating on LinkedIn for a few weeks. You have probably seen it. It comes from Anthropic's Economic Index report, a study on AI's impact across professions, and it places architecture near the top of fields most exposed to automation. Every time it surfaces, it is posted by someone with "AI strategist" or "future of work" in their bio. The comments section fills quickly, mostly with agreement.

That consensus deserves some examination.

Read More
Process Andrei Vasilief Process Andrei Vasilief

What Does an Architect Actually Do on a Residential Project?

Most homeowners come to an architect with a version of the same mental image: someone who sketches a beautiful house, hands the drawings to a contractor, and collects a fee. That image isn't entirely wrong — but it leaves out about 80% of what actually happens, and almost all of the parts that determine whether your project succeeds or fails.

This is a phase-by-phase account of what an architect does on a residential project. Not a job description. Not a sales pitch. An honest breakdown of where the work sits, what it costs you if it's skipped, and where the real value lives.

Read More
Process Andrei Vasilief Process Andrei Vasilief

How Your Construction Budget Is Set — and Protected — Through Design

Budget conversations in residential architecture tend to follow a predictable pattern. A client arrives with a number in mind, hands it to the architect, and expects it to survive contact with the contractor. It rarely does — not because contractors are unpredictable, but because the number was never properly defined in the first place.

Budget control isn't a checkpoint at the end of design. It's a discipline embedded in every phase of it, shaped progressively as the project moves from concept to construction. Here's how that works in practice.

Read More
New Construction Andrei Vasilief New Construction Andrei Vasilief

Slope, Setbacks, and FAR: The Site Constraints That Decide Your Project Before You Do

Zoning is not a formality you hand off to a consultant after you've bought the land. It is the first design decision made on your project — and it was made without you, years or decades before you arrived. By the time you're standing on a lot imagining what you'll build, the zoning code has already determined how much of it you can cover, how high you can go, how far you must sit from every boundary, and — if the site has any slope to it — how much of your budget disappears into the ground before a single wall goes up.

Most first-time developers and investors don't discover this until they're mid-process. This article is the earlier conversation.

Read More
Process Andrei Vasilief Process Andrei Vasilief

Square Footage Tells You How Big a Home Is. It Tells You Nothing Else.

Open any property listing — residential, custom build, or otherwise — and the first number you see is square footage. Sometimes it's the only number that gets any real emphasis. Bedrooms, bathrooms, and then: 2,400 sq ft, as if that settles it. As if knowing how much floor area a home contains tells you anything meaningful about how it feels to live there.

It doesn't. And if you're planning a custom build or a significant renovation, treating square footage as a proxy for quality is one of the more expensive assumptions you can make.

Read More
Process Andrei Vasilief Process Andrei Vasilief

How We Cut the Friction From Custom Home Design — Without Cutting the Quality

Custom home design has a reputation. It takes too long. It costs more than expected. At some point, the client — the person the project is supposed to be for — starts to feel like a peripheral figure in their own process. Meetings that produce more meetings. Weeks that pass with little to show. A vague sense that everyone is busy, but the project isn't really moving.

Most people assume this is just how it goes. It isn't.

The friction that defines so many residential projects isn't an unavoidable feature of serious design work. It's a structural inheritance — ways of working that made sense in a different era and have survived largely because the profession hasn't been in a hurry to replace them.

Read More
Process Andrei Vasilief Process Andrei Vasilief

Hiring a Remote Architecture Firm: How It Works and Why It Opens Up Your Options

When BIG designs a cultural center in a country where none of its architects have ever lived, nobody questions whether it will work. The same is true of Renzo Piano, Foster + Partners, or any of the firms whose names have become shorthand for architectural ambition. Remote practice — working across borders, time zones, and building cultures — has been standard operating procedure for large firms for decades.

What's changed is that it's now a realistic option for residential clients hiring someone to design their home. That shift is recent, and most homeowners haven't caught up to it yet. The assumption is still that your architect should be local — someone you can meet for coffee, who knows the permit office by name, who can swing by the site on a Tuesday. That assumption is worth examining. Because the tools that once made remote practice the exclusive domain of well-resourced institutional firms are now available to boutique studios, and the client on the other end of a custom home project stands to benefit directly.

This article explains how it works — and why, for the right project, it's not a compromise at all.

Read More
US Virgin Islands Andrei Vasilief US Virgin Islands Andrei Vasilief

Building in the Caribbean: A Practical Guide to Climate, Materials, and Permits

Building a home in the Caribbean is one of those ideas that looks straightforward from a distance and gets complicated the moment you start asking specific questions. The climate is beautiful. The land is available. The lifestyle is the point. But the construction environment — the materials, the systems, the permits, the terrain — operates by its own rules, and they are not the same rules that apply in Florida, or France, or anywhere else you may have built before.

This guide uses the US Virgin Islands as its primary lens, but the fundamentals apply broadly across the Caribbean basin. If you are planning a custom build in the region, this is where to start.

Read More
New Construction Andrei Vasilief New Construction Andrei Vasilief

How to Choose the Right Roofing System: Flat, Pitched, and Mono-Pitched Roofs Explained

Choosing a roofing system is one of the earliest structural decisions in any residential build — and one of the most consequential. Get it wrong and you're looking at chronic maintenance problems, energy inefficiency, or a roof that fights your design at every turn. Get it right and it becomes invisible, which is exactly what a good roof should be.

This guide covers the three main residential roof types — flat, double-pitched, and mono-pitched — with a focus on what actually drives the decision: climate, budget, and the building itself.

Read More
Renovation Andrei Vasilief Renovation Andrei Vasilief

Home Renovation: 5 Principles That Actually Matter Before You Start

Most home renovation advice is a list of solutions. Change this, upgrade that, use these materials. The problem is that solutions without context are just guesses. What works in one home, for one family, with one set of habits, won't necessarily work in yours.

The five principles below aren't a checklist. They're a way of thinking about renovation decisions before you make them — and they apply whether you're updating a few rooms or gutting the entire house.

Read More
Process Andrei Vasilief Process Andrei Vasilief

What Documents Do You Need to Build a House? A Complete Guide to Construction Drawing Sets

If you're planning a custom build, at some point someone will hand you a document called a Construction Drawings package and expect you to know what it is. Most clients don't — and that's a problem, because this package is the entire technical backbone of your project. It determines what gets built, how it gets built, and what it costs.

This guide breaks down every component of a standard CD set, what each drawing actually does, and why it matters to you as a client.

Read More